Short communication channels, fast decision-making, and personal commitment characterize our way of working.
Since 2003
Maximum Accuracy
70+ Employees
Land Purchase & Demolition: Total area increases to 21,000 m²
Machine park expanded:
Gantry milling machines:
1 × “Flagship” Correa Verxa 17750 | Foundation made of 1,000 tons of concrete + 18-meter pile foundation
1 × DMG MORI DMU 340 P | Pit-mounted machine with accuracy package, 180-position tool changer, and high-performance milling head
1 × DMG MORI DMC 210 U | Pit-mounted machine with large pallet storage, column extension, and high-performance milling head
Milling Centers:
1 × DMG MORI DMC 160 U
1 × DMG MORI DMC 125 U
1 × DMG MORI DMC 100 U
4 × DMG MORI DMU 50 + Robot
Turning Centers:
1 × “Universal Monster” DMG MORI CTX gamma 2000 TC + Robot
2 × DMG MORI CTX 2500-1250
New Construction Hall 11: Central tool storage
New Construction Hall 12: Turning center hall
Land Purchase & Demolition: Total area increases to 20,000 m²
New Construction Halls 6–8: 11 m hall height, incl. climate-controlled measuring room
Production Area: Expansion to 11,500 m²
New Office Building: 800 m² incl. social rooms
9 New Indoor Cranes: Up to 160 t lifting capacity
Warehouse & Logistics: 2,000 pallet spaces & covered loading area
Measurement Technology: Commissioning of a WENZEL gantry measuring machine (4.5 × 2.6 × 1.75 m)
Photovoltaics: Expansion to 1 MW output
E-Mobility: Installation of 12 charging points
Machine Park: +5 machining centers & 1 CNC lathe
Certification: According to ISO 9001:2015
Quality Assurance: Addition of FARO laser tracker & measuring arm
IT: Renewal incl. document management system
Infrastructure: Investments in hall ventilation & air conditioning
Modernization: Replacement of older traveling column milling machines with state-of-the-art new systems
Team Growth: 60 employees & 8 apprentices through company acquisition
New Construction Halls 4 & 5: 2,000 m² production area & 160 t crane capacity (site consolidation)
Production: 3-shift operation on 6 large machining centers, 5 machining centers & 3 CNC lathes
Hall Construction: Construction of additional halls
Production Area: To 4,000 m² in Halls 1–3
Team: 30 employees
Apprenticeship: Regular graduations as precision mechanics
Crane Capacity: Indoor cranes up to 160 t lifting capacity
Founding: FORMA MASCHINENBAU Zerspanungstechnologie GmbH & Co. KG by Norbert Groß-Onnebrink
New Hall Construction: 1,000 m² production area
Production Start: With 5 employees & brand-new CNC traveling column milling machine
From the beginnings to the technology leader in the region.
State-of-the-art technology not only in production, but also in energy supply.
A large part of our electricity requirements is covered by the photovoltaic system installed on our hall roofs in 2020.
In addition, we use a combined heat and power (CHP) plant for highly efficient coupled electricity and heat generation.
Consistent recycling of chips and cooling lubricants minimizes our ecological footprint.
Proven high quality – our currently valid certifications at a glance.